Skip to content
ComRep

Create.
Complete.
Report.

Project reporting for field teams—site notes, photos, hours and follow-up in one dependable project record.

Made for phones on site PDF, Word, Excel and whole-project CSV

Daily report · fictional exampleReady to review
Northbank Energy Centre · Main site

Commissioning progress

18 SEP
Today’s work

Boiler sequence checks, pump rotation checks and control panel walkdown.

Concern 03 · Open

P-02 vibration above limit

Carry forward for follow-up
Hours recorded7.5 hrsSample timesheet
Photo attachments1 / 3
Industrial control panel in a fictional report attachment.
Interface panelFictional report attachment
Two engineers beside a control cabinet during a fictional witnessed test.
Witnessed testFictional report attachment
Pumps, insulated pipes and valves inside a sample plant room.
Plant roomFictional report attachment
Illustrative preview · not a saved record

See how a project record comes together

Click through the core ComRep modules in a sample commissioning workspace: reports, timesheets, schedule, team, locations and the action tracker. Every detail is fictional; nothing you explore is saved or connected to a project.

Explore the interactive demo

Your format.
Your workflow.

Start with one of eight report templates. Choose your report blocks, arrange and title sections, then save and reuse the template when creating a new report.

See all eight templates
  • Commissioning progress report

    Daily progress, system checks, constraints, and next shift priorities.

  • Daily site progress report

    A concise field log for workforce, completed work, tomorrow’s plan, and actions.

  • Maintenance service report

    Document the asset, service performed, condition, and recommended follow-up.

  • Inspection report

    Capture inspection scope, evidence, findings, and corrective actions.

  • Punch-list report

    Track open and closed commissioning items with clear ownership and evidence.

  • Equipment testing report

    Record test setup, acceptance criteria, measured results, and exceptions.

  • Site-visit summary

    Share the visit purpose, observations, decisions, and assigned actions.

  • Handover report

    Summarize readiness, accepted records, outstanding work, and transfer of responsibility.

Make a template your own
Template builderIllustrative preview

Daily commissioning

Choose, arrange and title your blocks.

01People on site
02Work completed today
03Photo attachments
04Actions for next shift
Saved to this projectReusable

Whole-project
CSV.

Export report, timesheet and summary rows across every location in one whole-project CSV.

CSV is not a complete archive and does not include attachments. PDF, Word and Excel are separate report export formats.

Explore the interactive demo

Make today’s work
part of the record.

Start Free Try the PlaygroundExplore the interactive demo